1. KEY SPECIFICATIONS
Details of the land plot and factory currently available for transfer:
|
Item
|
Details
|
|
Location
|
Road 09 and Road 14, Giang Dien Industrial Park, Tam Phuoc Commune, Dong Nai Province.
|
|
Land Area (Lot No. 14)
|
10,691 m² (Land use term until 2058).
|
|
Factory Area
|
5,500 m² (Solid pre-engineered steel structure).
|
|
Office Area
|
Land area inside is pre-planned so that clients can build their own offices.
|
|
Auxiliary Works
|
Parking area, , Guard house, Firefighting system, Underground fire-fighting water tank.
|
2. TECHNICAL & INFRASTRUCTURE ADVANTAGES
The factory is well-invested and constructed to meet the strict standards of FDI enterprises:
- Factory Structure:
- Clear height: 11m, spacious, suitable for installing large machinery or overhead cranes.
- Floor loading capacity: 3 tons/m², reinforced concrete floor with Hardener finish (anti-dust).
- Roofing system: Cold rolled steel sheet with insulation layer and skylights for energy saving.
- Fire Protection System (PCCC): Fully equipped with automatic Sprinkler system inspected and licensed.
- Power Supply: The Giang Dien Industrial Park has already planned a power substation, ensuring a stable power supply for production. The substation can be installed immediately depending on customer needs.
- Wastewater: Connected directly to the central collection system of the Industrial Park.
3. LEGAL STATUS
We commit to absolute transparency and safety for the transaction:
- ✅ Land Use Rights Certificate (LURC) available
- ✅ Construction Completion Certificate issued for assets on land.
- ✅ Full Environmental & Fire Protection permits.
4. SUITABLE INDUSTRIES
With standard design, this factory is suitable for diverse manufacturing sectors:
- Precision engineering, Electronic component assembly.
- Industrial packaging, Plastic molding.
- Logistics warehousing, Goods storage.
- Garment & Footwear.
- Other manufacturing sectors that comply with the Industrial Park's Environmental Permit.
5. ACTUAL IMAGES



Image 1-3: Factory frontage and main gate.





Image 4-8: Interior space (showing wide span and floor quality).
.jpg)
.jpg)
Image 9-10: Wastewater treatment plant.
.jpg)
.jpg)
Image 11-12: 110kV substation.
6. TRANSFER PRICE & CONTACT
- Transfer Price: Contact us now for a quote. (Including assets on land and land sublease rights).
- Transaction Method: Asset Transfer.
Contact Sonadezi Giang Dien Sales Department now for a site visit and legal dossier review.
Pictures